Bloomfield Medical Center
Orange acquired a new Medical from Zauner constructions. Zylem successfully tendered on the Joinery on level 2. The main feature was the ceiling detail, which gave the project impact and improved acoustic performance. The original specification was for solid timber, but weight and cost made this prohibitive. This is where polytec Steccawood came into play. It gave us the option to change the specifications and supply a product that was consistent, stable, cost effective and attractive.
Completion Date
2020
Designer/Specifier
Zylem
Photographer
Little Image Co
Builder
Zauner Constructions
Architect
Lefflers Simes Architects
Joiner
Zylem